Remodeling contractor
in Williamsville, NY

Kitchens, bathrooms, additions and basements for the older homes in the village and the colonials and ranches around it, about ten minutes from our office.

5.0 on Yelp5.0 on GoogleBonded and insured, $5M umbrellaBBB AccreditedFree on-site estimatesResidential and commercial

Remodeling for
Williamsville homes

Williamsville is really two neighborhoods. The village grew up along Main Street and Ellicott Creek, and its older houses call for a contractor who plans for what may turn up once the walls are open. The 14221 streets around it, most of them in the Town of Amherst, are mid-century and later, and they call for a plan that makes the most of a good, solid house. We remodel kitchens, bathrooms and basements in both, and we build additions where the lot allows.

Village houses and the streets around them

Inside the village, near Main Street, many homes date from the late 1800s to the 1930s: frame houses with plaster walls, narrow stairs and kitchens that several owners have redone in several decades. Outside the village line, the streets off Maple, Transit and Youngs Road were built mostly from the 1960s through the 1980s, with colonials and ranches that have good bones and original bathrooms. Older houses reward planning for what is behind the plaster. Newer ones reward a look at which walls can come out.

Our office on John James Audubon Parkway is about ten minutes from Main Street. One of our Williamsville jobs is the home addition in the review below: the old patio taken out, then foundation and framing, plumbing and electrical, and a new roof, all on one written scope.

From our office

About 10 minutes

Permit office

Village of Williamsville or Town of Amherst

Written estimate

3 to 5 business days after the on-site visit

What we build
in
Williamsville

Many lots around the village are deep enough for an addition off the back of the house, which is why additions sit first in the list. Everything else we do is available here too.

Recent projects
in
Williamsville

Full kitchen gut on W Ferry: white shaker cabinets, a walnut island with a marble top, and new white oak floors.
Buffalo

White shaker kitchen with marble island

Kitchen
View the gallery
Down-to-the-studs bathroom remodel: navy walls, marble-look tile, a freestanding tub and a frameless glass shower.

Navy bath with freestanding tub and marble shower

Bathroom
View the gallery
Kitchen remodel on Temple Dr: maple shaker cabinets, white quartz counters and new plank flooring replace oak and tile.

Maple shaker kitchen with quartz counters

Kitchen
View the gallery
Tub-to-shower conversion with marble-look tile, a fluted walnut vanity, round mirror and brass fixtures.

Fluted walnut vanity and marble walk-in shower

Bathroom
View the gallery
Basement finish with a painted black ceiling, warm grey walls, light plank flooring and a rebuilt stair.

Finished basement with black ceiling and light plank floors

Living space
View the gallery
Finished basement with a family room, home gym corner and a full bath with geometric tile and a black vanity.

Basement family room with geometric tile bath

Living space
View the gallery
A former pizza shop rebuilt as Crispy Burger: new floors, walls, counters, lighting and a red storefront.
Buffalo

Crispy Burger, full restaurant build-out

Commercial
View the gallery
Exterior painting and storefront work for Spot Coffee on Elmwood Avenue, finished ahead of schedule.
Buffalo

Spot Coffee, storefront remodel

Commercial
View the gallery
Full bathroom gut: marble-look tile on the floor and walls, an oak double vanity and a glass-door shower.

Marble bath with oak double vanity

Bathroom
View the gallery
Full bathroom rebuild with a large-format grey tile shower, pebble floor and a new white vanity.

Grey tile shower with blue walls

Bathroom
View the gallery
Bathroom remodel replacing wallpaper and an oak vanity with a grey marble-look walk-in shower and a barn door.

Marble walk-in shower behind a barn door

Bathroom
View the gallery
A hallway closet converted into a half bath with new plumbing, a vanity and a lit mirror.

Closet turned into a half bath

Bathroom
View the gallery
Steel-framed basement finish with a painted black ceiling, grey walls and a home gym.

Basement gym with black ceiling

Living space
View the gallery
Basement finish with grey plank flooring, a painted ceiling and a new full bathroom with a glass shower.

Finished basement with full bath

Living space
View the gallery
Basement finish with insulated framing, grey plank floors and a painted black ceiling.

Finished basement with grey plank floors

Living space
View the gallery
Office addition in Rochester: new framed rooms with interior windows and block wainscot, built during business hours.
Rochester

Office addition with interior windows

Commercial
View the gallery
Exterior stucco work on the columns and canopy of an Amherst office building, shown in progress.
Amherst

Exterior stucco, office building

Commercial
View the gallery
Home addition in Clarence: the new brick-faced addition with a covered back patio, from excavation and foundation through framing to the finished bedroom.
Clarence

Home addition with covered patio

View the gallery
New bathroom in a Clarence home addition: blue square-tile corner shower with a frameless glass door, hex marble floor and a white vanity.
Clarence

Blue tile shower in a new addition

Bathroom
View the gallery
See all projects
Projects in
Williamsville
We are still adding photos of our Williamsville work to the site. Every project in our gallery is a real RenoTitan job, with no stock photos and no renderings.
See our recent projects
Working with Armen and his crew to renovate my kitchen was a great experience. It was my first major update in my condo and they walked me through every step with respect and kindness. With excellent attention to detail, quick turnaround, and openness to my questions, RenoTitan Remodeling earned my full trust and I will be sure to hire them again.
Karla RogersKitchen remodel · Buffalo, NY
The job was started on the day we agreed, without any delays, and was finished even earlier than I expected. The men were extremely courteous, minimized any disruptions, and cleaned up every day before they left. I was not charged even one dime more over the agreed contract price to fix any problems encountered.
John FarrellBathroom remodel · West Falls, NY
They took care of everything, from demo of the existing patio, through foundation and framing, plumbing and electrical, and a new roof. The pricing was fair, and the "not to exceed" clause was the icing on the cake. We have heard so many horror stories of people using other contractors, getting quoted one number, only to encounter huge cost overruns. We saw none of that with RenoTitan.
Mark DunlapHome addition · Williamsville, NY

Remodeling questions
from
Williamsville

01
Is my house in the village or in the Town of Amherst?

It depends on the street. Both use a Williamsville mailing address, but the Village of Williamsville and the Town of Amherst have separate building departments, and the permit comes from whichever one covers your property. We confirm which applies before we plan the permit, so there is no surprise at the counter.

02
Are there extra rules for exterior work on older village houses?

They may be. Some older properties in the village can face extra review for changes to the outside, such as siding, windows, porches or an addition. We check with the village before we plan any exterior change to an older home, and if a review is needed, it goes into the schedule.

03
What do you find when you open the walls in an older house?

Often old wiring, galvanized supply lines or cast-iron drains, framing cut for an earlier remodel, and plaster over wood lath. We point out what is likely at the consultation, and the written estimate says how anything found behind the walls will be handled, so a discovery does not turn into a dispute halfway through the job.

04
Can you build an addition that matches the house?

Yes. A good addition reads as part of the house: the roofline, siding, trim and windows match, and the floor inside meets the existing floor without a step unless you want one. Additions start with architectural drawings. We can connect you with architectural professionals, and the plans feed an accurate written estimate.

05
How long does an addition take?

Longer than a single room, because drawings and the permit come first. Once those are in place, the build itself depends on the size and what it connects to: a new bathroom or kitchen in the addition adds plumbing and electrical work. You review the anticipated schedule with us before work begins and follow it in JobTread as the job moves.

Serving
Williamsville
& Western New York

We work across Williamsville and the Town of Amherst, and in Clarence, Tonawanda, Depew, Buffalo and the Southtowns.

See our service areas

Ready to plan
your Williamsville project?

Tell us about your house and what you want to change, and we will set up a free on-site consultation.

Call or text(716) 428-8428Emailinfo@renotitan.comOffice251 John James Audubon Pkwy, Ste 129
Buffalo, NY 14228
HoursMonday to Friday
8:30 AM to 6 PM
Closed weekends.

Tell us about your project

No obligation. We will call to discuss your project and set up an on-site consultation.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.