Bathroom remodeling by RenoTitan Remodeling in Buffalo, NY

Bathroom remodeling
in Buffalo, NY

Showers, tile, vanities and the waterproofing behind them, from a full gut renovation to turning a closet into a half bath, managed from estimate to final walkthrough.

5.0 on Yelp 5.0 on Google Bonded and insured, $5M umbrella BBB Accredited Free on-site estimates Residential and commercial

What goes behind the tile
matters most

A bathroom packs water, steam, drains and wiring into a small room, and the tile has to stay put for years. In older Buffalo homes, opening the walls can turn up cast iron drains, galvanized water lines or a soft subfloor around the toilet. We look for those signs at the on-site consultation, so they are planned for instead of found halfway through.

Then the room is built in layers. A waterproofing membrane goes behind and under the shower tile, not just grout and paint. The exhaust fan is sized for the room and vented outside. Vanity, mirror and lighting are planned together, so outlets land where they belong. Plumbing and electrical are handled by established, licensed and insured trade partners, and we manage the schedule around every step.

What a
bathroom remodeling
project can include

  • Full gut renovations
  • Tub-to-shower conversions
  • Walk-in tile showers and glass doors
  • Freestanding and alcove tubs
  • Vanities, mirrors and lighting
  • Floor and wall tile
  • Exhaust fans and ventilation
  • Closet to half-bath conversions

Recent
bathroom
projects

Full kitchen gut on W Ferry: white shaker cabinets, a walnut island with a marble top, and new white oak floors.
Kitchen

White shaker kitchen with marble island

Buffalo
View the gallery
Down-to-the-studs bathroom remodel: navy walls, marble-look tile, a freestanding tub and a frameless glass shower.
Bathroom

Navy bath with freestanding tub and marble shower

View the gallery
Kitchen remodel on Temple Dr: maple shaker cabinets, white quartz counters and new plank flooring replace oak and tile.
Kitchen

Maple shaker kitchen with quartz counters

View the gallery
Tub-to-shower conversion with marble-look tile, a fluted walnut vanity, round mirror and brass fixtures.
Bathroom

Fluted walnut vanity and marble walk-in shower

View the gallery
Basement finish with a painted black ceiling, warm grey walls, light plank flooring and a rebuilt stair.
Living space

Finished basement with black ceiling and light plank floors

View the gallery
Finished basement with a family room, home gym corner and a full bath with geometric tile and a black vanity.
Living space

Basement family room with geometric tile bath

View the gallery
A former pizza shop rebuilt as Crispy Burger: new floors, walls, counters, lighting and a red storefront.
Commercial

Crispy Burger, full restaurant build-out

Buffalo
View the gallery
Exterior painting and storefront work for Spot Coffee on Elmwood Avenue, finished ahead of schedule.
Commercial

Spot Coffee, storefront remodel

Buffalo
View the gallery
Full bathroom gut: marble-look tile on the floor and walls, an oak double vanity and a glass-door shower.
Bathroom

Marble bath with oak double vanity

View the gallery
Full bathroom rebuild with a large-format grey tile shower, pebble floor and a new white vanity.
Bathroom

Grey tile shower with blue walls

View the gallery
Bathroom remodel replacing wallpaper and an oak vanity with a grey marble-look walk-in shower and a barn door.
Bathroom

Marble walk-in shower behind a barn door

View the gallery
A hallway closet converted into a half bath with new plumbing, a vanity and a lit mirror.
Bathroom

Closet turned into a half bath

View the gallery
Steel-framed basement finish with a painted black ceiling, grey walls and a home gym.
Living space

Basement gym with black ceiling

View the gallery
Basement finish with grey plank flooring, a painted ceiling and a new full bathroom with a glass shower.
Living space

Finished basement with full bath

View the gallery
Basement finish with insulated framing, grey plank floors and a painted black ceiling.
Living space

Finished basement with grey plank floors

View the gallery
Office addition in Rochester: new framed rooms with interior windows and block wainscot, built during business hours.
Commercial

Office addition with interior windows

Rochester
View the gallery
Exterior stucco work on the columns and canopy of an Amherst office building, shown in progress.
Commercial

Exterior stucco, office building

Amherst
View the gallery
Home addition in Clarence: the new brick-faced addition with a covered back patio, from excavation and foundation through framing to the finished bedroom.

Home addition with covered patio

Clarence
View the gallery
New bathroom in a Clarence home addition: blue square-tile corner shower with a frameless glass door, hex marble floor and a white vanity.
Bathroom

Blue tile shower in a new addition

Clarence
View the gallery
See all projects
Working with Armen and his crew to renovate my kitchen was a great experience. It was my first major update in my condo and they walked me through every step with respect and kindness. With excellent attention to detail, quick turnaround, and openness to my questions, RenoTitan Remodeling earned my full trust and I will be sure to hire them again.
Karla RogersKitchen remodel · Buffalo, NY
The job was started on the day we agreed, without any delays, and was finished even earlier than I expected. The men were extremely courteous, minimized any disruptions, and cleaned up every day before they left. I was not charged even one dime more over the agreed contract price to fix any problems encountered.
John FarrellBathroom remodel · West Falls, NY
They took care of everything, from demo of the existing patio, through foundation and framing, plumbing and electrical, and a new roof. The pricing was fair, and the "not to exceed" clause was the icing on the cake. We have heard so many horror stories of people using other contractors, getting quoted one number, only to encounter huge cost overruns. We saw none of that with RenoTitan.
Mark DunlapHome addition · Williamsville, NY

How a RenoTitan project runs
from the first call

A bathroom before the remodel: an oak vanity, white floor tile and a wallpaper border

01

Consultation & estimate

Every project begins with an on-site consultation to discuss your goals, evaluate the space and take measurements. Once we have the necessary project details, we typically provide a detailed written estimate within 3 to 5 business days.

The same bathroom cleared to the subfloor, with green board up and the new drain and water lines in place

02

Planning & scheduling

Before construction begins, we review the scope, material selections and anticipated schedule. Through JobTread, you have project information, schedule updates, documents and secure online payments in one place.

New floor tile going down beside the framed shower niche, set out with a laser level

03

Construction & communication

We oversee every phase of construction, coordinate the trades and keep you updated through JobTread throughout the project.

The finished bathroom from the doorway: grey tile floor, blue-grey walls and a glass walk-in shower beside the vanity

04

Final walkthrough

When the work is complete, we walk through it with you, address any remaining details, and make sure the project meets our quality standards and your expectations.

Planning an addition? Projects that need architectural drawings start with plans. We can connect you with architectural professionals to develop what is needed for an accurate estimate.

A bathroom that holds up
to daily use

Finished bathroom remodeling project by RenoTitan Remodeling

A layout with room to move

A vanity with real drawer space, a mirror at the right height and clear floor around the toilet. We plan the room so the entry door, the drawers and the shower door never collide.

Full bathroom rebuild with a large-format grey tile shower, pebble floor and a new white vanity.

Steam that clears

Fresh paint, trim and the window frame stay clean longer when steam has somewhere to go. An outside-vented fan sized for the room clears it after every shower, even through a closed-up Buffalo winter.

Bathroom remodel replacing wallpaper and an oak vanity with a grey marble-look walk-in shower and a barn door.

Water stays where it belongs

Shower tile goes over a waterproofing membrane, with the floor sloped to the drain, so water ends up in the drain line instead of the subfloor or the ceiling of the room below.

A hallway closet converted into a half bath with new plumbing, a vanity and a lit mirror.

A bathroom where there was none

A closet, a wide hallway or a corner beside an existing bathroom can become a half bath when drain and water lines are within reach. We check the plumbing access before you commit.

Questions about
bathroom remodeling
in Buffalo

01
How long does a bathroom remodel take?

It depends on the scope. Replacing a vanity, toilet and floor is a short job. A full gut with a new tiled shower takes longer, because waterproofing, tile and grout each need time before the next step. You get an anticipated schedule with your written estimate and can follow progress in JobTread.

02
Can you turn my tub into a walk-in shower?

Yes. The tub comes out, the drain is moved or resized for a shower, and the walls and floor get a waterproofing membrane before tile goes on. A low curb or none, a glass door, a bench or niches each change the framing, so we settle those details at the consultation.

03
Do I need a permit for a bathroom remodel?

Cosmetic work such as a new vanity, mirror or paint usually does not need one. Changes to plumbing, electrical or framing usually do, and the rules vary from town to town across Western New York. We go over what your project involves at the consultation and account for permit time in the schedule.

04
Can you add a half bath to my house?

Often, yes. The deciding factor is plumbing: a toilet needs a drain and a vent within a workable distance, and the sink needs water lines. A closet under the stairs or next to an existing bathroom is a common candidate, and we have turned a closet into a half bath before.

05
What affects the cost of a bathroom remodel?

Moving the toilet or the shower drain, the amount of tile, the shower glass and the vanity usually drive the cost more than the size of the room. Keeping fixtures where they are saves the most. After the on-site consultation you typically receive a written estimate within 3 to 5 business days.

Working with Armen and his crew to renovate my kitchen was a great experience. It was my first major update in my condo and they walked me through every step with respect and kindness. With excellent attention to detail, quick turnaround, and openness to my questions, RenoTitan Remodeling earned my full trust and I will be sure to hire them again.
Karla RogersKitchen remodel · Buffalo, NY
The job was started on the day we agreed, without any delays, and was finished even earlier than I expected. The men were extremely courteous, minimized any disruptions, and cleaned up every day before they left. I was not charged even one dime more over the agreed contract price to fix any problems encountered.
John FarrellBathroom remodel · West Falls, NY
They took care of everything, from demo of the existing patio, through foundation and framing, plumbing and electrical, and a new roof. The pricing was fair, and the "not to exceed" clause was the icing on the cake. We have heard so many horror stories of people using other contractors, getting quoted one number, only to encounter huge cost overruns. We saw none of that with RenoTitan.
Mark DunlapHome addition · Williamsville, NY

Serving Buffalo
& Western New York

We remodel bathrooms for homeowners in Buffalo, Amherst, Williamsville, Clarence, Tonawanda, West Seneca, Hamburg, Depew, Lancaster, Orchard Park and East Aurora.

See our service areas

Ready to start
your bathroom?

Tell us what is not working in your bathroom and we will set up a free on-site consultation to look at the space.

Call or text(716) 428-8428Emailinfo@renotitan.comOffice251 John James Audubon Pkwy, Ste 129
Buffalo, NY 14228
HoursMonday to Friday
8:30 AM to 6 PM
Closed weekends.

Tell us about your project

No obligation. We will call to discuss your project and set up an on-site consultation.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.